Rules of Origin for diesel generating sets, output 375 to 1,000 kva — Dubai (UAE) to India

HS 85021310 · ELECTRIC GENERATING SETS AND ROTARY CONVERTERS · Rules of Origin & preferential rate

Data last updated: · MFN duty & IGST verified against ICEGATE (Indian Customs EDI). Rules of Origin per CEPA Annex 3B. Verify your exact HS line before filing.

CEPA eligible
Yes
Value addition (RVC)
40%
Tariff-classification change
CTH Annex 3B rule set at chapter level — it covers the whole chapter, not this code alone
MFN → CEPA basic duty
7.5% → 0%

Rule of Origin (CEPA Annex 3B, primary source): CTH + VA 40% (CEPA Annex 3B Product-Specific Rule; tariff-shift AND value addition both required).

Qualifying under the Rules of Origin

To claim the CEPA preference on diesel generating sets, output 375 to 1,000 kva (HS 85021310), the goods must qualify as UAE-originating. The Product-Specific Rule (Annex 3B) is "CTH + VA 40% (CEPA Annex 3B Product-Specific Rule; tariff-shift AND value addition both required)": the goods must undergo a change of tariff heading (CTH) AND add at least 40% regional value content — both conditions, not either/or. Read that rule for what it is: Annex 3B supplies it at chapter level, so it governs hundreds of eight-digit codes rather than this one. It is the correct rule to apply, and it is also the place to check for a more specific carve-out before committing to a claim. Large gensets back up data centres, industrial plants and infrastructure, and single units carry substantial value — so removing the basic duty under CEPA translates into real per-shipment savings rather than a rounding adjustment. The catch is origin: at this scale almost all the value is in the engine and alternator, and meeting 40% UAE regional value content is genuinely difficult unless major sub-assembly happens locally. Do not assume the preference; obtain the manufacturer's origin calculation in writing at order stage, when the factory is already assembling documentation. BIS certification, emission norms and factory-acceptance testing run in parallel and often drive the timeline more than the duty position does. On equipment ordered months ahead, confirm that the schedule rate quoted at order still applies at clearance. A valid Certificate of Origin filed through the eCoO 2.0 system must accompany the shipment; without it, customs charges the 7.5% MFN rate instead of the preference.

Check your own figures in the Rules of Origin (RVC) qualifier. Qualifying is only half of it — the preference is claimed with a Certificate of Origin, issued in the UAE before shipment or retrospectively within 12 months.

Frequently asked questions

Does diesel generating sets, output 375 to 1,000 kva qualify for India–UAE CEPA?
Yes, if it meets the Annex 3B Product-Specific Rule "CTH + VA 40% (CEPA Annex 3B Product-Specific Rule; tariff-shift AND value addition both required).": it must BOTH change tariff classification (CTH) AND add at least 40% regional value content — both conditions are required, not either/or.
What is the Rule of Origin for diesel generating sets, output 375 to 1,000 kva?
Per CEPA Annex 3B: CTH + VA 40% (CEPA Annex 3B Product-Specific Rule; tariff-shift AND value addition both required).. RVC% = [(FOB − value of non-originating materials) / FOB] × 100 (FOB basis).
What proof is needed at import?
A preferential Certificate of Origin filed through eCoO 2.0, presented at customs before clearance. Without it, the 7.5% MFN duty applies.